WORKED DEFAULT
Check the calculation with the default inputs
If 171 of 180 scheduled jobs requiring identified parts have them reserved at authorized start, readiness is 95.00%.
- Freeze the denominatorScheduled jobs requiring identified parts
- Apply one numerator ruleScheduled jobs with parts ready at start
- Calculate and interpretParts readiness = jobs with required parts ready / scheduled jobs requiring parts x 100%.