Private browser inputs
Values are processed in this browser tab. This workspace does not upload form content to the Nirmion API or fetch external records.
PRODUCTIVITY WORKROOM / RESOURCE ALLOCATION PLANNER
Aggregate assigned hours by person and compare each total with one planning-period capacity.
Values are processed in this browser tab. This workspace does not upload form content to the Nirmion API or fetch external records.
Hours are summed by exact person name; utilization is person total ÷ entered capacity × 100.
The result is a planning aid. A named owner should verify dates, assignments, calculations, policy language, and decisions before operational use.
Working method
Hours are summed by exact person name; utilization is person total ÷ entered capacity × 100.
A project, per-person capacity, and person | work item | hours rows.
Use the example to understand pipe-separated rows, keep names consistent across references, and enter unknown facts as blank rather than guessing.
Review the formula-protected csv with person-level utilization percentages, verify every source value, then copy or download the separately named nirmion_tools artifact.
Practical use cases
Before operational use
Limits and responsibility
Equal capacity is assumed for every person and hours are not availability guarantees. Review leave, skills, concurrency, uncertainty, and non-project work.
Product questions
These answers describe the actual browser-local generation, validation, output, and retention behavior.
No. It applies deterministic formatting or documented calculations only to the values you enter.
No. Form values and recent output remain in this browser tab unless you explicitly download a file.
No. Review owners, dates, assumptions, formulas, policy requirements, and destination formatting before use.