Resource Allocation Planner

Aggregate assigned hours by person and compare each total with one planning-period capacity.

Browser-local generationNo account requiredInputs stay in this browser tab. Each text field is bounded, structured lists accept up to 1,000 rows, and output is generated only when requested.

Step 1 / reviewed inputs

Prepare your Resource Allocation workspace

3 fields

Use reviewed operational facts, follow the stated line grammar, then inspect the generated artifact before sharing or adopting it.

Ready to generateValidate the visible fields, then generate a formula-protected CSV with person-level utilization percentages.
Checking publication status before enabling this workspace...

01

Private browser inputs

Values are processed in this browser tab. This workspace does not upload form content to the Nirmion API or fetch external records.

02

Deterministic method

Hours are summed by exact person name; utilization is person total ÷ entered capacity × 100.

03

Human approval remains required

The result is a planning aid. A named owner should verify dates, assignments, calculations, policy language, and decisions before operational use.

Working method

How the resource allocation planner works

Hours are summed by exact person name; utilization is person total ÷ entered capacity × 100.

  1. 01
    Prepare reviewed facts

    A project, per-person capacity, and person | work item | hours rows.

  2. 02
    Apply the visible method

    Use the example to understand pipe-separated rows, keep names consistent across references, and enter unknown facts as blank rather than guessing.

  3. 03
    Review and retain

    Review the formula-protected csv with person-level utilization percentages, verify every source value, then copy or download the separately named nirmion_tools artifact.

Practical use cases

Where this tool helps

  • Review a sprint allocation draft.
  • Find obvious over-allocation.
  • Prepare a staffing conversation.

Before operational use

Review these points before using the output

  • Confirm the input reflects the current project, people, dates, and source evidence.
  • Check every structured row uses the documented number and order of pipe-separated columns.
  • Assign a named reviewer for calculations, priorities, responsibilities, and policy-sensitive wording.
  • Download the artifact and keep it with the source decision or project record when traceability matters.

Limits and responsibility

A generated template is not an approved operating decision

Equal capacity is assumed for every person and hours are not availability guarantees. Review leave, skills, concurrency, uncertainty, and non-project work.

Product questions

What this workspace does and does not do

These answers describe the actual browser-local generation, validation, output, and retention behavior.

Does this tool use AI or invent missing project facts?

No. It applies deterministic formatting or documented calculations only to the values you enter.

Are these inputs uploaded or saved to an account?

No. Form values and recent output remain in this browser tab unless you explicitly download a file.

Is the generated output ready to approve automatically?

No. Review owners, dates, assumptions, formulas, policy requirements, and destination formatting before use.