Nirmion
Help Find a tool

CONTROLLED OPERATIONS LAB

Supplier Scorecard

Calculate a transparent 0-100 weighted supplier score from criteria whose weights total exactly 100 while retaining evidence and human review for every input.

Browser processor readyRuns in this browser tabAccountable human review requiredUp to 500 rows using exactly 5 displayed input columns and 20,000 total characters.

Input

Build the supplier scorecard

Enter one complete row per line in the displayed column order. The exported CSV protects leading spreadsheet formula characters.

0 / 180

Name one bounded system, release, process, period, supplier, or programme. Avoid combining unrelated reviews.

0 / 180

Name the role responsible for validating the evidence and approving or escalating the final decision.

0 / 20,000

Follow the displayed pipe-separated order exactly. Do not put a pipe character inside a cell.

Required row orderCriterion | Weight percent | Score | Evidence reference | Reviewer

0 / 20,000

Optionally add approved evidence references, assumptions, exceptions, source dates, and follow-up context.

Review draft

Your reviewable output appears here

The supplier scorecard is generated only from the values you provide. No evidence, status, score, or approval is inferred.

  1. Load the fictional example to learn the exact input grammar.
  2. Replace it with one bounded set of approved facts and evidence references.
  3. Generate, inspect, download, then record the accountable decision elsewhere.

Product contract

Understand the supplier scorecard before use

This contract states the real input grammar, deterministic transformation, output format, and human-decision boundary for this route.

01

What it does

Calculate a transparent 0-100 weighted supplier score from criteria whose weights total exactly 100 while retaining evidence and human review for every input.

02

What you need

Complete pipe-separated rows from reviewed service, incident, continuity, asset, facility, supplier, maintenance, or work-control evidence, plus a bounded scope and accountable owner.

03

What you receive

A separately named nirmion_tools file containing a formula-safe CSV register. Download resets current fields; the latest three small outputs remain available in this tab for re-download.

Practical workflow

A defensible supplier scorecard workflow

Use this route to calculate a transparent 0-100 weighted supplier score from criteria whose weights total exactly 100 while retaining evidence and human review for every input. It does not connect to telemetry or inventory, execute commands or work, inspect facilities, assess safety, change records, or authorize an operational decision.

Before generation

Confirm the service, site, asset, environment, incident, change, or work reference; current evidence; safety and approval policy; decision authority; communication; and escalation ownership.

After generation

Reconcile the draft with authoritative telemetry, asset, inventory, work, change, incident, safety, and supplier records; obtain approvals; then act only through controlled systems and qualified personnel.

Likely edge cases

Every row needs five input cells. Weight and score must each be from 0 to 100, all weights must total exactly 100, and Nirmion calculates each weighted contribution and the total.

Decision boundary

A planning artifact does not authorize operational action

Do not execute commands, deploy, roll back, change infrastructure or inventory, dispatch work, return equipment to service, classify an incident, assess safety, or decide on a supplier from this output alone. Authorized qualified reviewers must validate live evidence, controls, approvals, and stop conditions.

Pre-use checklist

Review before operational use

  • Remove secrets, credentials, tokens, exploit details, raw customer data, precise sensitive configuration, and unnecessary asset or personnel identifiers.
  • Confirm scope, identity, evidence timestamp, assumptions, safety controls, authority, communication, handoff, rollback or stop condition, and escalation ownership.
  • Check every row, statement, calculation, status, exception, mitigation, and follow-up action.
  • Record approvals and decisions in the controlled system, act through approved processes and qualified personnel, and monitor explicit acceptance and stop criteria.

Help and limitations

Supplier Scorecard questions

Does this tool connect to systems, inspect a site, or execute operational work?

No. It structures supplied information or performs visible arithmetic. It does not query telemetry, scan assets, count inventory, inspect facilities, execute commands, dispatch work, page responders, or approve an operational decision.

Are inputs uploaded or retained?

No server request is used for generation. Entered text and the latest three generated outputs remain in this browser-tab instance until you refresh or close it. Do not enter information your policy forbids in a browser tool.

What happens after download?

The current form and result reset automatically. You can re-download the latest three generated text artifacts while this tab remains open, then validate and store the approved artifact in your official system.