WORKED DEFAULT
Check the calculation with the default inputs
If 184 of 200 supplier requests due include the required response by deadline, the deadline rate is 92.00%.
- Freeze the denominatorSupplier requests due
- Apply one numerator ruleDue supplier requests answered on time
- Calculate and interpretDeadline rate = due requests answered by deadline / requests due x 100%.