WORKED DEFAULT
Check the calculation with the default inputs
Validated savings of $500,000 divided by a $10.0m addressable baseline gives a 5.00% savings rate.
- Validate savings$500,000
- Confirm baseline$10.0m addressable spend
- Divide$500k / $10m = 5.00%