WORKED DEFAULT
Check the calculation with the default inputs
If 15 of 300 asset inspection tasks open at the snapshot are past their valid due dates, the overdue rate is 5.00%.
- Freeze the denominatorAsset inspection tasks open
- Apply one numerator ruleOpen asset inspections past due
- Calculate and interpretOverdue inspection rate = open past-due inspections / open inspection tasks x 100%.