WORKED DEFAULT
Check the calculation with the default inputs
If 142 of 150 calibration events due are completed and recorded by cutoff, calibration plan completion is 94.67%.
- Freeze the denominatorCalibration events due
- Apply one numerator ruleDue calibrations completed by cutoff
- Calculate and interpretCalibration completion = due events completed by cutoff / events due x 100%.