WORKED DEFAULT
Check the calculation with the default inputs
If 12 of 240 scheduled production shifts experience at least one qualifying unplanned line stop, the affected shift rate is 5.00%.
- Freeze the denominatorScheduled production shifts assessed
- Apply one numerator ruleScheduled shifts with qualifying stop
- Calculate and interpretAffected shift rate = shifts with a qualifying stop / scheduled shifts assessed x 100%.