WORKED DEFAULT
Check the calculation with the default inputs
If an asset has 12 unplanned downtime hours within 240 scheduled production hours, its unplanned downtime rate is 5.00%.
- Freeze the denominatorScheduled production time
- Apply one numerator ruleUnplanned downtime
- Calculate and interpretUnplanned downtime rate = unplanned downtime / scheduled production time x 100%.