WORKED DEFAULT
Check the calculation with the default inputs
If 456 of 480 eligible received loads are fully put away by cutoff, putaway cutoff completion is 95.00%.
- Freeze the denominatorEligible received loads
- Apply one numerator ruleEligible loads put away by cutoff
- Calculate and interpretPutaway completion = loads put away by cutoff / eligible received loads x 100%.